Our Projects

Let Our Work do the Talking

Wood and Jepsen has worked on hundreds of projects throughout Fiji and the South Pacific especially in countries such as Tonga, Western Samoa, Vanuatu, Christmas Island, Solomon Islands, Niue, Cook Islands, Kiribati, Tuvalu and East Timor.

With decades of experience, we’ve completed projects for virtually every type of development scenario in the South Pacific. We’re also proud to hold an exceptional track record of not having a professional indemnity action bought against us for incorrect or non-professional type activities.

Through this, our current and future clients can be safe in the knowledge of our excellent work conduct, and put their trust in us to experience the best in quality service. Below is a sample listing of many of our activities throughout the years.

CLIENT

DESCRIPTION

DATE

VALUE MILLION $F

HOUSING AUTHORITY

(FIJI)

Layout design, engineering design, contract administration land transfer (cadastral) surveying for Nepani subdivision, Nasinu

(approx. 250 residential sites)

1971-1972 0.3
Ditto for Valelevu subdivision at Nasinu, approximately 180 lots plus regional centre. 1971-1972 0.4
Ditto for minor subdivisions in Kinoya area. 1971-1972 0.2
Ditto for Natokowaqa subdivision in Lautoka, approximately 100 lots. 1973-1974 0.4
Ditto for Viria Road subdivision      Vatuwaqa, approximately 100 lots. 1973-1974 0.2
Ditto for Edenvllle housing scheme 1974-1975 0.15
Ditto Makoi development at Nasinu, approximately 800 lots. 1978-1980 1.5
Ditto, engineering design only for Nabua Stage 3, approximately 200 lots. 1979 0.3
Ditto, design of Kalabo development, Nasinu approximately 150 lots. 1980-1981 0.2
Ditto for Tavakubu subdivision, Lautoka approximately 350 lots. 1983-1985 0.7
Ditto for Nadawa subdivision, Nasinu, approximately 600 lots. 1981-1986 2.0
Caubati Stage 2. Planning, survey, engineering design and supervision. 1999-2001 .527
Vunidogo Subdivision. Planning and engineering design. 2000 .350
Natabua (Balance). Planning, survey, engineering design and supervision. 2002 .2
Waila Stage 3B. Master plan. 2002 2.0
HOOKER FIJI LIMITED Complete layout design engineering design.

Contract supervision and administration, and land transfer surveying for Namadi Heights development, Suva, approximately 350 lots.

1972-1977 1.5
Ditto Tamavua Heights, Suva approximately 100 lots. 1978 0.6
Ditto Nakasi Park Estate, Nasinu, 700 lots Stages I and II 1979-1985 4.0
Ditto Nausori farmlets. 1976 0.1
K BHINDI BROS. LTD Layout design, engineering design and contract supervision and administration and land transfer surveys for Vatuwaqa Industrial    development, Suva. 1981 – 2002 4.0

 

Ditto Tamavua Residential subdivision, Wailoku, Suva. 1981- 2002 2.0
Ditto Vatuwaqa Residential subdivision, Suva 500 lots. 1985-Current

 

3.5
MISCELLANEOUS CLIENTS Similar input in many other land development subdivisions in Suva and elsewhere. 1971 – Current

 

PACIFIC HOTELS & DEVELOPMENTS LTD & WAKAYA LTD

 

Part planning and complete engineering design, administration and surveying of development of Wakaya Island Resort, Fiji, including water supply, airstrip, etc (900 hectares). 1979-2005 5.0
PACIFIC HOTELS & DEVELOPMENTS LTD Planning engineering design and land transfer surveys at Pacific Harbour Resort. 1976 – 2004

 

2.0
NAVUA BEACH RESORTS

 

Complete layout and engineering      design of resort at Navua for 500 lots (not implemented) 1976-1985

 

 

2.0
NARAIN CONSTRUCTION Development layout and report for Native Land at Tacirua, Suva. 1973 2.5
UNITED NATIONS &

SUVA CITY COUNCIL

 

Greater Suva Traffic Study 1980  

 

NATIVE LAND DEVELOPMENT CORPORATION Layout and engineering design for  Narere Residential subdivision 300 lots. 1987-1990 1.0
Layout design for Tacirua East 700 lots 1988 1.7
GOVERNMENT OF FIJI:

 

Engineering design, contract supervision and set-out surveys, Parliament of Fiji. (Civil contract) 1989-1992

 

1.0
Engineering design, contract supervision and survey work associated with upgrading of National Stadium track and associated facilities. 1990-1991 0.70
Ditto Above For Multi-Purpose All-weather courts for Netball, Tennis, Volleyball, Basketball, National Sports complex, Laucala Bay. 1992 0.60
Ditto Above For Kalabu Industrial Tax Free Zone. 1988-1993 1.70
BURGESS (FIJI) LTD Engineering design and set-out surveys Industrial development Laucala Beach Estate 1990-1991 0.70

CLIENT

DESCRIPTION

DATE

MINISTRY OF AGRICULTURE

FOREST & FISHERIES

DRAINAGE & IRRIGATION

DEPARTMENT

 

Provided major photo-grammetric survey control of Rewa Delta.

 

1980
Ditto for Wainikoro

 

1980
Ditto for Naitasiri

 

 

1981
RENDEL PALMER &

TRITTON (FOR FIJI

GOVERNMENT )

 

 

Realignment surveys for Suva-Nadi Road.

 

1973
SIR ALEXANDER GIBB & PARTNERS

 

 

 

Photo-grammetric control surveys at Wainisavulevu  (Monasavu).

1981
Road access to dam; alignment     surveys

(6 kilometres).

 

1982

VARIED

 

 

 

Numerous agricultural subdivisions.

 

1971- PRESENT
Cadastral surveys.

 

1971-PRESENT
Photo-grammetric  control surveys.

 

1971- PRESENT
ROUGHTON & PARTNERS

(FOR FIJI GOVERNMENT)

Kings Road Upgrading and bridge site surveys. (Nadaro-Korovou) – 21 km

 

1988

 

EUROPEAN UNION 6 Bridge Site Surveys – East Timor 2005

 

ANGLICAN CHURCH

 

Survey of 5000ac Natoavatu, Savusavu 2013 -14

 

FIJI ROADS AUTHORITY Detailed Site surveys

 

2013 – 14

 

FIJI ROADS AUTHORITY Road Upgrade & realignment surveys 2013– 14

 

ISLAND QUARRIES LTD Cadastral & detailed site surveys, Mau Quarry.

 

2013 – 14
FULTON HOGAN HIWAYS Detailed site & set-out surveys 2013 – 14

 

TAVEUNI DEVELOPMENT LTD  

School site surveys (Koro)

10 school sites

 

2014 – Present

 

RAM PYARE BROS.

 

Survey of 1000 ac at Dreketi 2014 – Present

 

MHW             

 

Detailed site surveys for Road Upgrading projects.

 

2013 – 14
SAVASI LTD

 

Subdivision of Savasi Island, Savusavu 2012 – Present

 

KALO EXPLORATION LTD

 

Control & Topographical surveys Kelikoso, Vanua Levu

 

2014
JEAN-MICHEL COUSTEAU RESORT

 

Detailed site survey of  Cousteau’s Resort, Savusavu 2014

 

BASIC INDUSTRIES LTD

 

Stockpile surveys & calculation of volumes (10 sites in Viti Levu, Vanua Levu&Ovalau)

 

2014
ROUGHTON & PARTNERS

(FOR FIJI GOVERNMENT)

 

 

 

 

 

 

Queens Road (Viseisei Bypass),

Vuda , detailed site surveys

3.5km.

1990
Kings Road upgrading and

bridge site surveys 35km (Navolau – Dama)

1992
Nabouwalu – Dreketi highway upgrading and bridge site surveys 23 km.

 

1992
200km preliminary surveys

for road upgrading throughout

Fiji using G.P.S.   1995-96

1995-1996
22km upgrading of Hibiscus Highway, Savusavu

 

1998
22km upgrading of Taveuni coast road 1998

 

20km upgrading of Natovi Road, Tailevu

 

1999
33km upgrading of Kings Road

18km upgrading Natadola(Maro) Road

1999

2001

GOVERNMENT OF FIJI

 

PrincesroadLand Acquisition surveys

(21km)

 

1990-1993
Wainikoro – Dama road land acquisition surveys (19km)

 

1999
KINHILL, RIEDEL & BYRNE

(TONGA)

 

Road upgrading projects, Tonga, 100km detailed site surveys, plot horizontal and vertical profiles. 1993-1994
ROUGHTON &

PARTNERS (VANUATU)

 

Road location surveys (10km), plot horizontal and vertical profiles, (80km).

 

1994
JICA STUDY TEAM

Both of these major projects were completed within the given timeframe.  The 1996-97 project included 180 x A1 plans and the 1997-98 project 60 x A1 plans.  The first project involved 8 x 2 man survey parties.  The second project involved 6 x 2 man survey parties.

Initial project contract was $300,000.00 and the second project was $360,000.00.

River Profile & Cross Section

Surveys, Rewa, Sigatoka, Nadi

& Ba Rivers (200km).

1996-1997

 

River diversion scheme

NadiRiver (4 months)

1997-1998
PUBLIC   WORKS DEPARTMENT FIJI

 

Prepare report on sewage reticulation and treatment for Labasa. 1972
Trunk sewer routing and priority study for Greater Suva Sewerage Scheme

(adopted).

1980
SUVA CITY COUNCIL

 

 

 

Engineering    design for

upgradingQueen Elizabeth Drive, Suva.

1982
Ditto for Lakeba    and Augustus Streets, Suva. 1976
Feasibility  study for Tamavua Valley Road. 1973
Miscellaneous minor road/ drainage reports and design.

 

1972-1992
  Detailed surveys at Suva Market & Bus Stand 2014

 

  Detailed surveys Albert Park Upgrading Project. 2014
MISCELLANEOUS

 

Several water supply and treatment schemes and sewage disposal systems associated with developments and resorts 1971-Current
JICA CORPORATION

 

PrincessMargaretHospital, Tuvalu.  Topographical and Bathymetric survey. 2000
CHURCH OF JESUS CHRIST OF LATTER-DAY-SAINTS Topographical surveys, Kiribati 2000, 2007
NATADOLA LAND HOLDINGS LTD Topographical, GPS, Engineering and Cadastral surveys for Natadola Marine Resorts. 2003-2007
ROUGHTON INTERNATIONAL Road Corridor Surveys Kiribati (120km) 2012
GOVERNMENT OF FIJI Vuda to Kashmir water supply. GPS Control

Topographical and Cadastral Surveys

 

Vaturu to Nagado water supply. GPS Control Topographical and Cadastral Surveys

 

KhalsaRoadLand Acquisition Survey

 

Wainikoro-Dama Rd Land Acquisition Survey

 

Sawani-Serea Rd land acquisition Survey

2002

 

 

2002-2003

 

 

2003

 

2003

 

 

2003

Jittu Estate.  Planning, subdivision and engineering design.

 

Tovata Water Supply Scheme. Topographical & Cadastral surveys

 

Suva-Nausori Water Supply & Sewerage Project

Package 2A & Package 2B

Engineering and Cadastral Surveys

 

Package 5 Suva – Nausori Project

Engineering and Cadastral Surveys

 

Savusavu Water & Sewerage Projects

2001-2002-2003

 

 

2002 – 2003

 

 

 

 

2003-2004

 

 

2004 – 2010

 

2005 – 2008

AIRPORTS FIJI LIMITED Sub-consultants to ErasitoBeca Consultants for survey of apron area, NadiInternationalAirport and engineering survey for southern extension of runway 02. 2003
Survey of all individual slabs on Nadi International Airports.  Sub-consultants to Houng Lee Kaba& Partners. 2004
Setting out works for Downer Construction on slab replacement and for AFL engineering branch for Taxiway light positions, NadiInternationalAirport. 2005
FIJI RESORTS LTD Detailed topographical survey of 939 acres, Natadola 2006-2007
FIJI ELECTRICITY AUTHORITY Wind turbine surveys, Butoni 2005-2012
Survey of Monasavu Water Catchment Reserve
Korovou Power Station Survey