Let Our Work do the Talking
Wood and Jepsen has worked on hundreds of projects throughout Fiji and the South Pacific especially in countries such as Tonga, Western Samoa, Vanuatu, Christmas Island, Solomon Islands, Niue, Cook Islands, Kiribati, Tuvalu and East Timor.
With decades of experience, we’ve completed projects for virtually every type of development scenario in the South Pacific. We’re also proud to hold an exceptional track record of not having a professional indemnity action bought against us for incorrect or non-professional type activities.
Through this, our current and future clients can be safe in the knowledge of our excellent work conduct, and put their trust in us to experience the best in quality service. Below is a sample listing of many of our activities throughout the years.
CLIENT |
DESCRIPTION |
DATE |
VALUE MILLION $F |
||
HOUSING AUTHORITY
(FIJI) |
Layout design, engineering design, contract administration land transfer (cadastral) surveying for Nepani subdivision, Nasinu
(approx. 250 residential sites) |
1971-1972 | 0.3 | ||
Ditto for Valelevu subdivision at Nasinu, approximately 180 lots plus regional centre. | 1971-1972 | 0.4 | |||
Ditto for minor subdivisions in Kinoya area. | 1971-1972 | 0.2 | |||
Ditto for Natokowaqa subdivision in Lautoka, approximately 100 lots. | 1973-1974 | 0.4 | |||
Ditto for Viria Road subdivision Vatuwaqa, approximately 100 lots. | 1973-1974 | 0.2 | |||
Ditto for Edenvllle housing scheme | 1974-1975 | 0.15 | |||
Ditto Makoi development at Nasinu, approximately 800 lots. | 1978-1980 | 1.5 | |||
Ditto, engineering design only for Nabua Stage 3, approximately 200 lots. | 1979 | 0.3 | |||
Ditto, design of Kalabo development, Nasinu approximately 150 lots. | 1980-1981 | 0.2 | |||
Ditto for Tavakubu subdivision, Lautoka approximately 350 lots. | 1983-1985 | 0.7 | |||
Ditto for Nadawa subdivision, Nasinu, approximately 600 lots. | 1981-1986 | 2.0 | |||
Caubati Stage 2. Planning, survey, engineering design and supervision. | 1999-2001 | .527 | |||
Vunidogo Subdivision. Planning and engineering design. | 2000 | .350 | |||
Natabua (Balance). Planning, survey, engineering design and supervision. | 2002 | .2 | |||
Waila Stage 3B. Master plan. | 2002 | 2.0 | |||
HOOKER FIJI LIMITED | Complete layout design engineering design.
Contract supervision and administration, and land transfer surveying for Namadi Heights development, Suva, approximately 350 lots. |
1972-1977 | 1.5 | ||
Ditto Tamavua Heights, Suva approximately 100 lots. | 1978 | 0.6 | |||
Ditto Nakasi Park Estate, Nasinu, 700 lots Stages I and II | 1979-1985 | 4.0 | |||
Ditto Nausori farmlets. | 1976 | 0.1 | |||
K BHINDI BROS. LTD | Layout design, engineering design and contract supervision and administration and land transfer surveys for Vatuwaqa Industrial development, Suva. | 1981 – 2002 | 4.0
|
||
Ditto Tamavua Residential subdivision, Wailoku, Suva. | 1981- 2002 | 2.0 | |||
Ditto Vatuwaqa Residential subdivision, Suva 500 lots. | 1985-Current
|
3.5 | |||
MISCELLANEOUS CLIENTS | Similar input in many other land development subdivisions in Suva and elsewhere. | 1971 – Current | –
|
||
PACIFIC HOTELS & DEVELOPMENTS LTD & WAKAYA LTD
|
Part planning and complete engineering design, administration and surveying of development of Wakaya Island Resort, Fiji, including water supply, airstrip, etc (900 hectares). | 1979-2005 | 5.0 | ||
PACIFIC HOTELS & DEVELOPMENTS LTD | Planning engineering design and land transfer surveys at Pacific Harbour Resort. | 1976 – 2004
|
2.0 | ||
NAVUA BEACH RESORTS
|
Complete layout and engineering design of resort at Navua for 500 lots (not implemented) | 1976-1985
|
2.0 | ||
NARAIN CONSTRUCTION | Development layout and report for Native Land at Tacirua, Suva. | 1973 | 2.5 | ||
UNITED NATIONS &
SUVA CITY COUNCIL
|
Greater Suva Traffic Study | 1980 |
|
||
NATIVE LAND DEVELOPMENT CORPORATION | Layout and engineering design for Narere Residential subdivision 300 lots. | 1987-1990 | 1.0 | ||
Layout design for Tacirua East 700 lots | 1988 | 1.7 | |||
GOVERNMENT OF FIJI:
|
Engineering design, contract supervision and set-out surveys, Parliament of Fiji. (Civil contract) | 1989-1992
|
1.0 | ||
Engineering design, contract supervision and survey work associated with upgrading of National Stadium track and associated facilities. | 1990-1991 | 0.70 | |||
Ditto Above For Multi-Purpose All-weather courts for Netball, Tennis, Volleyball, Basketball, National Sports complex, Laucala Bay. | 1992 | 0.60 | |||
Ditto Above For Kalabu Industrial Tax Free Zone. | 1988-1993 | 1.70 | |||
BURGESS (FIJI) LTD | Engineering design and set-out surveys Industrial development Laucala Beach Estate | 1990-1991 | 0.70 | ||
CLIENT |
DESCRIPTION |
DATE |
MINISTRY OF AGRICULTURE
FOREST & FISHERIES DRAINAGE & IRRIGATION DEPARTMENT
|
Provided major photo-grammetric survey control of Rewa Delta.
|
1980 |
Ditto for Wainikoro
|
1980 | |
Ditto for Naitasiri
|
1981 | |
RENDEL PALMER &
TRITTON (FOR FIJI GOVERNMENT )
|
Realignment surveys for Suva-Nadi Road.
|
1973 |
SIR ALEXANDER GIBB & PARTNERS
|
Photo-grammetric control surveys at Wainisavulevu (Monasavu). |
1981 |
Road access to dam; alignment surveys
(6 kilometres).
|
1982 | |
VARIED
|
Numerous agricultural subdivisions.
|
1971- PRESENT |
Cadastral surveys.
|
1971-PRESENT | |
Photo-grammetric control surveys.
|
1971- PRESENT | |
ROUGHTON & PARTNERS
(FOR FIJI GOVERNMENT) |
Kings Road Upgrading and bridge site surveys. (Nadaro-Korovou) – 21 km
|
1988
|
EUROPEAN UNION | 6 Bridge Site Surveys – East Timor | 2005
|
ANGLICAN CHURCH
|
Survey of 5000ac Natoavatu, Savusavu | 2013 -14
|
FIJI ROADS AUTHORITY | Detailed Site surveys
|
2013 – 14
|
FIJI ROADS AUTHORITY | Road Upgrade & realignment surveys | 2013– 14
|
ISLAND QUARRIES LTD | Cadastral & detailed site surveys, Mau Quarry.
|
2013 – 14 |
FULTON HOGAN HIWAYS | Detailed site & set-out surveys | 2013 – 14
|
TAVEUNI DEVELOPMENT LTD |
School site surveys (Koro) 10 school sites
|
2014 – Present
|
RAM PYARE BROS.
|
Survey of 1000 ac at Dreketi | 2014 – Present
|
MHW
|
Detailed site surveys for Road Upgrading projects.
|
2013 – 14 |
SAVASI LTD
|
Subdivision of Savasi Island, Savusavu | 2012 – Present
|
KALO EXPLORATION LTD
|
Control & Topographical surveys Kelikoso, Vanua Levu
|
2014 |
JEAN-MICHEL COUSTEAU RESORT
|
Detailed site survey of Cousteau’s Resort, Savusavu | 2014
|
BASIC INDUSTRIES LTD
|
Stockpile surveys & calculation of volumes (10 sites in Viti Levu, Vanua Levu&Ovalau)
|
2014 |
ROUGHTON & PARTNERS
(FOR FIJI GOVERNMENT)
|
Queens Road (Viseisei Bypass),
Vuda , detailed site surveys 3.5km. |
1990 |
Kings Road upgrading and
bridge site surveys 35km (Navolau – Dama) |
1992 | |
Nabouwalu – Dreketi highway upgrading and bridge site surveys 23 km.
|
1992 | |
200km preliminary surveys
for road upgrading throughout Fiji using G.P.S. 1995-96 |
1995-1996 | |
22km upgrading of Hibiscus Highway, Savusavu
|
1998 | |
22km upgrading of Taveuni coast road | 1998
|
|
20km upgrading of Natovi Road, Tailevu
|
1999 | |
33km upgrading of Kings Road
18km upgrading Natadola(Maro) Road |
1999
2001 |
|
GOVERNMENT OF FIJI
|
PrincesroadLand Acquisition surveys
(21km)
|
1990-1993 |
Wainikoro – Dama road land acquisition surveys (19km)
|
1999 | |
KINHILL, RIEDEL & BYRNE
(TONGA)
|
Road upgrading projects, Tonga, 100km detailed site surveys, plot horizontal and vertical profiles. | 1993-1994 |
ROUGHTON &
PARTNERS (VANUATU)
|
Road location surveys (10km), plot horizontal and vertical profiles, (80km).
|
1994 |
JICA STUDY TEAM
Both of these major projects were completed within the given timeframe. The 1996-97 project included 180 x A1 plans and the 1997-98 project 60 x A1 plans. The first project involved 8 x 2 man survey parties. The second project involved 6 x 2 man survey parties. Initial project contract was $300,000.00 and the second project was $360,000.00. |
River Profile & Cross Section
Surveys, Rewa, Sigatoka, Nadi & Ba Rivers (200km). |
1996-1997
|
River diversion scheme
NadiRiver (4 months) |
1997-1998 |
PUBLIC WORKS DEPARTMENT FIJI
|
Prepare report on sewage reticulation and treatment for Labasa. | 1972 |
Trunk sewer routing and priority study for Greater Suva Sewerage Scheme
(adopted). |
1980 | |
SUVA CITY COUNCIL
|
Engineering design for
upgradingQueen Elizabeth Drive, Suva. |
1982 |
Ditto for Lakeba and Augustus Streets, Suva. | 1976 | |
Feasibility study for Tamavua Valley Road. | 1973 | |
Miscellaneous minor road/ drainage reports and design.
|
1972-1992 | |
Detailed surveys at Suva Market & Bus Stand | 2014
|
|
Detailed surveys Albert Park Upgrading Project. | 2014 | |
MISCELLANEOUS
|
Several water supply and treatment schemes and sewage disposal systems associated with developments and resorts | 1971-Current |
JICA CORPORATION
|
PrincessMargaretHospital, Tuvalu. Topographical and Bathymetric survey. | 2000 |
CHURCH OF JESUS CHRIST OF LATTER-DAY-SAINTS | Topographical surveys, Kiribati | 2000, 2007 |
NATADOLA LAND HOLDINGS LTD | Topographical, GPS, Engineering and Cadastral surveys for Natadola Marine Resorts. | 2003-2007 |
ROUGHTON INTERNATIONAL | Road Corridor Surveys Kiribati (120km) | 2012 |
GOVERNMENT OF FIJI | Vuda to Kashmir water supply. GPS Control
Topographical and Cadastral Surveys
Vaturu to Nagado water supply. GPS Control Topographical and Cadastral Surveys
KhalsaRoadLand Acquisition Survey
Wainikoro-Dama Rd Land Acquisition Survey
Sawani-Serea Rd land acquisition Survey |
2002
2002-2003
2003
2003
2003 |
Jittu Estate. Planning, subdivision and engineering design.
Tovata Water Supply Scheme. Topographical & Cadastral surveys
Suva-Nausori Water Supply & Sewerage Project Package 2A & Package 2B Engineering and Cadastral Surveys
Package 5 Suva – Nausori Project Engineering and Cadastral Surveys
Savusavu Water & Sewerage Projects |
2001-2002-2003
2002 – 2003
2003-2004
2004 – 2010
2005 – 2008 |
|
AIRPORTS FIJI LIMITED | Sub-consultants to ErasitoBeca Consultants for survey of apron area, NadiInternationalAirport and engineering survey for southern extension of runway 02. | 2003 |
Survey of all individual slabs on Nadi International Airports. Sub-consultants to Houng Lee Kaba& Partners. | 2004 | |
Setting out works for Downer Construction on slab replacement and for AFL engineering branch for Taxiway light positions, NadiInternationalAirport. | 2005 | |
FIJI RESORTS LTD | Detailed topographical survey of 939 acres, Natadola | 2006-2007 |
FIJI ELECTRICITY AUTHORITY | Wind turbine surveys, Butoni | 2005-2012 |
Survey of Monasavu Water Catchment Reserve | ||
Korovou Power Station Survey |